Stockholm, 9 August 2023. Northgold AB (Nasdaq First North Growth Market: “NG”, or “Northgold” or the “Company”) announces its first Mineral Resource Estimate (“MRE”) for the 100%-owned Kopsa gold and copper project in Central Finland.
Highlights
- Kopsa MRE totals 16.6 million tonnes (“Mt”) of in-situ resources grading 0.79 grams per tonne (“g/t”) gold (“Au”) and 0.16% copper (“Cu”), for combined grade of 1.03 g/t gold-equivalent (“AuEq”), containing 424,000 ounces (“oz”) Au and 56.8 million pounds (“Mlbs”) Cu, for combined metal of 547,000 oz AuEq (90% in the Measured and Indicated categories).
- Includes a pit-constrained resource, containing over 81% of the in-situ AuEq metal content, confirming a low strip ratio of 1.7.
- Also includes a higher-grade 1Mt starter pit grading 1.40 g/t Au and 0.17% Cu (1.65g/t AuEq), for 45,200 oz Au and 3.8 Mlbs Cu (53,500 oz AuEq), with an ultra-low strip ratio of 0.36, to provide high margin initial cash flow for the project.
- The Kopsa MRE was prepared in accordance with standards set out in 2012 Australasian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC code).
- Kopsa’s combination of average gold mine grade with low strip ratio places it near the top third of known deposits based on the combination of these two metrics, and should result in reasonably high margins once critical mass of resources are attained.
- The Kopsa MRE’s combined Measured, Indicated, and Inferred gold-equivalent resource ounces exceeds that of the historic 2012 resource estimate by 66%.
- This is an incredibly strong result given that this increase is largely due to the 4,200m drilled by the Company at Kopsa in 2022 (and partly due to a lower cutoff grade), which bodes well for substantial future resource growth with further drilling, including from the additional 2,000m already completed by the Company in 2023, with assays pending.
Mitch Vanderydt, CEO, comments: “Today’s resource estimate marks a significant, de-risking step forward, and snapshot in time, along Kopsa’s path towards commercial gold and copper production. The estimate combines gold and copper assay results from the drilling undertaken at Kopsa last year, with those results we inherited from historic resource drilling. This updated resource estimate greatly increases our confidence in the validity and accuracy of our inherited historic drill hole data, and reaffirms our conviction in Kopsa’s positive resource growth trajectory.”
About the Kopsa mineral resource estimate
The Kopsa 2023 MRE is based on the 4,200m of drilling completed by Northgold in 2022, and also incorporates 14,300m of historic drilling (that was also used in the historic 2012 and 2013 resource estimates). The MRE was prepared by Pekka Lovén and Markku Meriläinen (who also prepared the historic 2012 estimate), under the supervision of Hannu Makkonen, PhD, who is an Independent Qualified Person in compliance with JORC code. A Technical Report supporting the MRE is also being prepared in accordance with JORC code, and will become available on the Company’s website at www.northgoldab.com, during the fourth quarter of 2023. The MRE excludes significant additional exploration potential at depth, some of which was already drilled with another 2,000m completed in 2023, with assays pending for release in the coming weeks to months, and with results to be included in the next interim resource update anticipated for release in the first half of 2024 (pending the assay results).
A summary of the Kopsa MRE is shown in Table 1, and is illustrated visually in Figures 1 through 4. Figures 1 and 2 show the resource block model of the in-situ resource and the unoptimized, pit-constrained resource respectively.
Figures 3 and 4 highlight the previous and updated pit outlines at Kopsa, illustrating the recent growth extension and future growth potential in the S-SW direction, particularly at depth. The growth potential further to the S-SW has been tested by holes NGKOP23032 and NGKOP23034 (shown as dashed lines in Figure 4) that were drilled recently and with results pending. The historic 2012 and (unverified) 2013 resource estimates are summarized in Table 2.
Figure 5 compares the grade and strip ratio of select global open pit project peers to the pit-constrained portion of the Kopsa MRE, highlighting Kopsa’s relatively high ranking near the top third of project peers in terms of both strip ratio, and combination of strip ratio and grade.
Finally, Figure 6 compares the Kopsa MRE to that of Finland’s largest gold deposits, highlighting the minimal amount of drilling completed at Kopsa thus far relative to Finnish peer gold projects, resulting in overall mineral resources of 30 oz AuEq per m drilled. This bodes well for significant, low-cost resource growth still to come.
Comparison of Kopsa 2023 MRE to historic 2012 and 2013 mineral resource estimates
The Kopsa MRE was prepared by the same individuals as the historic 2012 resource estimate (web link) of 8.5Mt grading 0.98 g/t Au and 0.16% Cu (Pekka Lovén and Markku Meriläinen), using similar conservative assumptions, but at a lower cutoff grade of 0.3 g/t AuEq (versus cutoff grade of 0.4 g/t Au used in 2012). The Company was unable to verify the historic 2013 resource estimate (web link) of 16.3Mt grading 0.81 g/t Au and 0.16% Cu, which was prepared by others, and used less conservative assumptions, therefore the 2012 estimate has been used for a more appropriate “like-for-like” comparison in terms of progress. Northgold’s strong drill results from 2022 helped the combined Measured, Indicated, and Inferred tonnes to exceed the combined 2012 resource tonnes by factor of nearly double (96% increase), with the lower cutoff grade leading to the combined gold-equivalent grade being 15% lower. The resulting combined contained gold-equivalent ounces exceeded the combined 2012 gold-equivalent ounces by a substantial 66%.
Competent/qualified person statement
The technical information in this press release has been reviewed by Hannu Makkonen, PhD, from Suomen Malmitutkimus Oy. He has over 40 years of experience in mineral exploration in Finland, he is a European Geologist (EurGeol) and a Competent/Qualified Person as defined by the PERC Reporting Standard 2021, JORC Code, 2012 Edition, and by National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Dr. Makkonen owns no shares in Northgold AB, or its wholly-owned subsidiaries, Fennia Gold Oy, Lakeuden Malmi Oy, or Northern Aspect Resources Oy.
Table 1: Kopsa 2023 mineral resource estimate (0.3 g/t AuEq cutoff)
Resource Category | Tonnes | Grade | Contained gold | Contained copper | Contained gold-equivalent | |||||
(t) | g/t Au | % Cu | g/t AuEq | oz Au | kg Au | Lbs Cu | t Cu | oz AuEq | kg AuEq | |
Measured | 6,060,000 | 0.91 | 0.16 | 1.15 | 178,100 | 5,540 | 21,430,000 | 9,720 | 224,600 | 6,990 |
Indicated | 8,700,000 | 0.74 | 0.15 | 0.96 | 205,800 | 6,400 | 28,880,000 | 13,100 | 268,500 | 8,350 |
M&I | 14,760,000 | 0.81 | 0.15 | 1.04 | 383,800 | 11,940 | 50,310,000 | 22,820 | 493,200 | 15,340 |
Inferred | 1,830,000 | 0.68 | 0.16 | 0.92 | 40,100 | 1,250 | 6,510,000 | 2,950 | 54,300 | 1,690 |
Total | 16,590,000 | 0.79 | 0.16 | 1.03 | 424,000 | 13,190 | 56,810,000 | 25,770 | 547,400 | 17,030 |
Notes:
Figure 1: Block model for Kopsa project in situ mineral resource estimate
[see attachment for full release with images]
Figure 2: Kopsa 2023 MRE’s un-optimized open pit shell, starter-pit shell, and block model for pit-constrained portion.
[see attachment for full release with images]
Figure 3: Plan view map showing Kopsa 2023 MRE and un-optimized pit outlines versus historic resource and pit outlines, showing drill hole locations.
[see attachment for full release with images]
Figure 4: Cross section (60m wide) looking W-NW showing Kopsa 2023 MRE and un-optimized pit outlines relative to historic resource and pit outlines, showing drill hole tracings.
[see attachment for full release with images]
Figure 5: Kopsa vs. select global open pit project peers by pit-constrained deposit grade and strip ratio.
[see attachment for full release with images]
Figure 6: Finland’s largest gold deposits by resource size and drilling metreage
[see attachment for full release with images]
For additional information, please contact the CEO:
“Mitch Vanderydt”
Mitchell J. Vanderydt, P.Eng, MBA
Email: ir@northgoldab.com
Website: www.northgoldab.com
Follow us: www.linkedin.com/company/northgold
About Northgold
Northgold is a Swedish-listed gold exploration and development Company focused on advancing multiple, co-located, resource-stage projects in the Middle Ostrobothnia Gold Belt (MOGB) of Central Finland, including the Kopsa Gold-Copper project, the Kiimala Trend Gold project, and the Hirsikangas…